Kamloops runs permits through ePermit and publishes clear FAQ answers. Here is the process, what is exempt, what it costs, and how inspections work.
Kamloops handles building permits through its online ePermit system, with separate streams for homeowners, residential contractors and commercial contractors. The rules sit in two bylaws: the Building Regulation Bylaw No. 11-84 (when you need a permit and what is exempt) and the Fees and Charges Bylaw No. 44-14, Schedule C (what it costs). This guide pulls together what the City publishes about the process, documents, inspections and common snags. Sources are listed at the bottom; check them before you apply.
Rural addresses outside city limits usually fall under the Thompson-Nicola Regional District (TNRD), which has its own building rules. Check your property tax notice before you start drawings.
Is my project allowed? Zoning decides setbacks, height, lot coverage and whether a suite is allowed on your lot. Check it before you draw or apply for the permit: look up your address on the map, then read your zone in the bylaw.
Checked October 26, 2026 (City of Kamloops): zoning and CityMap · Zoning Bylaw No. 55 (PDF)
The City points to Part 13 of Building Regulation Bylaw No. 11-84 for when a permit is required and Part 6 for exemptions. Specific answers from the City’s building permit FAQ:
The City lists two costs: an application fee based on the type of application, and the building permit fee based on the value of construction. Both are in Schedule C of Fees and Charges Bylaw No. 44-14 (the City’s consolidation of the 2025 bylaw, effective July 29, 2025). Development cost charges are extra for projects that trigger them.
| Schedule C item | Fee |
|---|---|
| Non-refundable application fee: new single- or two-family dwelling, alteration/addition, accessory building over 10 m², demolition, retaining wall, pool and most other listed types | $175.00 |
| Building permit fee: construction value up to $10,000 | $20.00 per $1,000 or part thereof |
| Building permit fee: construction value over $10,000 | $200.00 plus $7.00 per $1,000 or part thereof above $10,000 |
| Alternate solution review | $250.00 each |
| Special inspection (normal hours) | $125.00 |
| Plumbing permit: minimum / first fixture, then each additional fixture | $50.00, then $8.00 each |
Worked example (our arithmetic, not a City quote): a $50,000 addition works out to $175 application fee + $200 for the first $10,000 + 40 × $7 = $280, for a total of $655 before plumbing permits, DCCs or other charges. The City confirms the actual fee when it reviews your ePermit application. Fees can change when the bylaw is amended, so check the current consolidation.
A re-inspection fee applies if work isn’t ready for inspection more than once or the approved plans aren’t on site, and it has to be paid before the inspection happens.
Kamloops only accepts certified solid-fuel appliances. Clearances follow the CAN/CSA-B365 installation code and the appliance label; the floor pad must extend 18 inches on the loading side and 8 inches on the other sides. Existing chimneys often don’t meet current standards, so have a qualified installer review yours before you connect a new appliance.
According to the City, plumbing work must be done by a BC certified plumber, an indentured apprentice supervised by one, or the registered owner who lives (or will live) in a single-family dwelling. The owner exception does not cover secondary suites, garden suites, commercial or multi-family buildings.
Removing a tree for your project? Our BC tree-cutting permit checker shows when Kamloops' tree bylaw needs a permit, with fees and official links.
| Purpose | Contact |
|---|---|
| Building Section | 105 Seymour Street, Kamloops · 250-828-3554 · building@kamloops.ca |
| Inspection request line (24/7) | 250-828-3300 |
| Building floor plans and information requests | 250-828-3559 · birbuilding@kamloops.ca |
| Jurisdiction check | Rural addresses: Thompson-Nicola Regional District |
Building Information Requests (a list of outstanding permits on a property) are applied for online. The City aims to reply by email within five to seven business days and cannot rush them. Since December 10, 2025, online requests carry a 2.75% credit card convenience fee; applying in person at 105 Seymour Street and paying by cash, cheque or debit avoids it.
Under Schedule C of Fees and Charges Bylaw No. 44-14, most applications carry a $175 non-refundable application fee. The permit fee is $20 per $1,000 of construction value up to $10,000, then $200 plus $7 per $1,000 above that. A $50,000 job works out to about $655 in total. DCCs and plumbing permits are extra where they apply.
Not for an accessory building of 10 m² or less in a residential zone, but it must still meet zoning setbacks.
The City points to Part 13.56 of Building Regulation Bylaw No. 11-84.
Only as the registered owner-occupant of a single-family dwelling, and not for suites, commercial or multi-family work. You still need a plumbing permit.
This guide relies on the official pages below. Rules, fees and processes change, so check the authority before you apply or spend money.