Permit Guide · Lower Mainland

City of Langley building permits: 2026 fees, how to apply, suites and inspections

The City of Langley prices permits on a construction-value ladder, takes a $200 application fee up front for house projects and credits it at issuance, and still takes building permit applications on paper. Here is what it costs, what to submit, what zoning allows and who to call.

Who this is for. Homeowners and small builders working inside the City of Langley. Not sure the job needs a permit? Start with the permit quiz, or confirm the right office for an address with the Permit Finder.

Is my project allowed? Zoning decides setbacks, height, lot coverage and whether a suite is allowed on your lot. Check it before you draw or apply for the permit: look up your address on the map, then read your zone in the bylaw.

Checked October 26, 2026 (City of Langley): zoning map (PDF) · Zoning Bylaw No. 3300

City of Langley at a glance

ItemWhat the City publishes
Permit fee$200 up to $10,000 of construction value, then a ladder of $10.56, $10.23, $9.63 and $10.00 per $1,000 or part (Bylaw 2837, Schedule 4)
Paid when you applyApplication fee: $200 for house work (new, additions, alterations). Credited against the permit fee at issuance (Building Bylaw s.11.6)
Processing timeNot published
How to applyPaper package from the City’s Building Permits page, submitted to the Building Division at City Hall. Permit fees can be paid online
SprinklersRequired in all buildings except single-family and two-family dwellings and some smaller alterations
Trade permitsPlumbing and fire sprinkler permits from the City; electrical and gas from Technical Safety BC
Inspections24-hour request line 604-514-2804, by 3 pm the day before

When you need a permit in the City of Langley

The City’s guide for additions and alterations to a house (April 12, 2022) says a permit is needed to repair, renovate or add to a building; remove, relocate, alter or build interior walls; finish an unfinished area; build or remove a secondary suite; build, cover or enclose a porch or sundeck; convert a carport to a garage or living space; demolish a building; build a chimney or install a wood stove or insert; build a retaining wall over 1 m high; install new plumbing fixtures or a backflow preventer; or build a swimming pool. Building Bylaw 2498 requires a separate permit for each building (s.7.4).

The same guide says a permit is not needed for non-structural minor work such as replacing cupboards, painting, re-roofing, repairing or replacing exterior finishes, replacing windows, and landscaping or sidewalks.

Checked October 9, 2026: City of Langley building permits · addition and alteration guide (PDF) · Building and Plumbing Bylaw No. 2498 (PDF) · Zoning Bylaw No. 3300 (PDF) · Tree Bylaw No. 3321 (PDF)

If you are not sure, call the Building Division at 604-514-2804 or email inspections@langleycity.ca.

Fees: Bylaw 2837, Schedule 4

Building fees are in Schedule 4 of the Fees and Charges Bylaw, 2010, No. 2837. The consolidations of December 9, 2024 and December 15, 2025 have the same Schedule 4, and the City’s separate Schedule 4 PDF shows the same figures. Amendment No. 38 (Bylaw 3327, January 26, 2026) changed only tree fees. All fees are subject to applicable taxes. The permit fee is based on construction value, which includes excavation and site preparation:

Construction valuePermit fee (Schedule 4)
$0 to $10,000$200
$10,001 to $50,000$200 + $10.56 per $1,000 or part over $10,000
$50,001 to $100,000$576 + $10.23 per $1,000 or part over $50,000
$100,001 to $500,000$1,088 + $9.63 per $1,000 or part over $100,000
$500,001 and up$5,286 + $10.00 per $1,000 or part over $500,000

The ladder is not smooth where the bands meet. By our arithmetic a $50,000 job is $622.40 but a $50,001 job is $586.23, and a $500,000 job is $4,940 but a $500,001 job is $5,296. We apply the schedule exactly as published; if your value is near $50,000 or $500,000, confirm the figure with the City.

An application fee is paid with the application:

Application fee (Schedule 4)Fee
Single-family dwelling: new, additions, alterations and renovations$200
Multi-family, commercial, industrial or institutional: new building or addition$2,200
Multi-family, commercial, industrial or institutional: alterations, renovations or tenant improvements$170
Plumbing permit without a building permit; fire sprinkler permit$100 each
All other permits$200

The application fee is not extra. Building Bylaw 2498 s.11.6 says it “shall be credited against the building permit fee when the permit is issued”, and is non-refundable if the application is cancelled. The City’s guides describe the same thing: a non-refundable fee at application, and the remainder of the permit fee calculated after plan review.

Worked examples (our arithmetic from Schedule 4; estimates only, confirm with the City). A $15,000 deck: $200 + (5 × $10.56) = $252.80, of which $200 is paid as the application fee and $52.80 at issuance. A $60,000 renovation: $576 + (10 × $10.23) = $678.30. A $250,000 addition: $1,088 + (150 × $9.63) = $2,532.50. A $900,000 new house: $5,286 + (400 × $10.00) = $9,286. Plumbing and sprinkler permits, damage deposits, engineering and servicing costs, tree permits and development cost charges are extra.

Notes in Schedule 4: the permit fee is doubled if work starts before the permit is issued; it is reduced by 10% (up to $250) where a registered professional certifies the design; and it is zero for leaky-condo repairs to multi-family buildings built from 1983 to 1998. Other Schedule 4 lines:

ItemFee
Plumbing permit$100 base + $40 per fixture
Fire sprinkler permit$100 + $4 per head
Demolition permit; permit transfer or renewal$200 each
Re-inspection$150
Legalizing an existing secondary suite / removing a suite$250 / $200
Building Code alternative solution$650 ($330 per revision)
Plan revisions; voluntary inspections$100 per hour (revisions minimum $100)
Interim occupancy, residential$50 per unit for 60 days, then $25 per 30 days

Before a permit is issued, Building Bylaw s.12.1 also asks for a damage deposit: $500 for a new house, $200 for additions, renovations or alterations to a house (except suite work), $500 per unit for multi-family (maximum $20,000), and 2% of value (minimum $1,000, maximum $20,000) for new commercial, industrial or institutional work.

Refunds: Schedule 4 refunds 100% of the permit fee before issuance and 50% after issuance, on written request. Building Bylaw s.11.4 limits the 50% refund to permits surrendered before any construction or inspection. The application fee is credited, not refunded, if you cancel.

The City does not publish an online fee calculator. For a planning figure, our BC permit fee estimator applies the same Schedule 4 ladder and shows the application fee as credited.

Checked October 9, 2026: Fees and Charges Bylaw No. 2837 (consolidated December 15, 2025, PDF) · Schedule 4 (PDF) · Amendment No. 38, Bylaw 3327 (PDF) · Building Bylaw s.11 and s.12

Processing times

Not published. None of the City’s building permit pages gives a processing time or target. The City posts monthly building permit reports, but they list permits issued, not how long review took. Under Building Bylaw s.7.5 an application can be cancelled if fees are not paid or plans are not amended within 6 months of the City’s notice, so answer review comments promptly. Compare cities that do publish times on our BC building permit wait times page.

How to apply

  1. Confirm the address is in the City (see the box above) and check its zone. Look the lot up in the Property Information search or the interactive map, then read the zone in Zoning Bylaw No. 3300.
  2. Download the guide and application package for your project from the Building Permits page: new house, addition or alteration, secondary suite, accessory building, sundeck, garage or carport conversion or demolition.
  3. Assemble the complete package. Typical items: the application form, Form 1 (owner’s acknowledgement, with original signatures), a title search no older than 48 hours, an agent’s authorization if a contractor applies, Schedule B and Form 2 where an engineer is involved, and two sets of plans drawn to scale on paper no smaller than 11 by 17 inches (no lined or graph paper, no pencil). The City says incomplete applications will not be accepted. Complex (Part 3) projects need an application submission meeting first.
  4. Submit to the Building Division at City Hall, 20399 Douglas Crescent (Monday to Friday, 8:30 am to 4:30 pm), and pay the application fee at the time of application. We found no online building permit submission on langleycity.ca.
  5. Plan review. The City reviews the plans against the Zoning Bylaw, the BC Building Code and its other bylaws, and calculates the rest of the permit fee.
  6. Pay and pick up. Permit fees can be paid online through Pay your Building Permit Fees, and permit accounts are in MyCity. Pay the damage deposit before issuance. A permit expires if work does not start within 6 months or stops for 12 months, and every permit expires 2 years after issue; suite, sign and demolition permits expire after 6 months (Building Bylaw s.13).
  7. Get your trade permits. Plumbing and fire sprinkler permits come from the City (plumbing application); electrical and gas permits come from Technical Safety BC. Contractors working in the City need a City business licence.

Checked October 9, 2026: building permits · addition guide · online services · Building Bylaw s.7 and s.13

More on packaging files: how to submit building permit drawings in BC.

Decks, sheds, garages, suites and plex homes

The siting numbers below are from the R1 Suburban Residential zone in Zoning Bylaw No. 3300 (adopted March 9, 2026). Other residential zones have their own numbers, so check your lot’s zone first. Some of the City’s permit guides date from 2022 and still refer to the old zoning; where they differ, the current Zoning Bylaw governs.

Decks

The City’s residential deck guide (April 14, 2022) says a permit is needed for a new deck more than 2 feet (0.6 m) above the surrounding finished grade, for repairs or additions to an existing deck, and for a cover over a deck, whether manufactured or site-built. Inspections are forms (footings), framing and final, and a BC Land Surveyor’s survey may be needed at the forms inspection to confirm setbacks. Zoning Bylaw 3300 does not allow roof-top patios in R1.

Sheds and accessory buildings

The City’s accessory building guide says detached buildings under 10 m² (107.64 ft²) do not need a building permit but must meet the zoning setbacks; new buildings and additions of 10 m² or more need a permit. In R1, accessory buildings can total no more than 60 m², may be no taller than 4.6 m, must sit at least as far back as the house and 1.0 m from it, and need setbacks of 6.0 m front, 1.5 m rear, 1.5 m interior side and 3.0 m exterior side (Zoning Bylaw 3300, s.2.4 and the R1 zone).

Garages and carport conversions

A detached garage is an accessory building, so the R1 limits above apply. Converting a carport to a garage, or a garage to living space, needs a permit, and the City has a separate guide for it. A carriage home above a garage is allowed in R1 (see below).

Secondary suites

A suite needs a building permit (secondary suite guide, with a suite declaration). Under Zoning Bylaw 3300 s.2.4(c), the registered owner must live on the lot; the suite must comply fully with the BC Building Code, be no larger than 100 m² and 40% of the building’s floor area, and have one off-street parking space on top of the two the house needs; and it is inspected through a building permit and recorded in the City’s suite registry. The City’s 2022 suite guide still quotes a 90 m² limit from the old zoning; the 2026 bylaw says 100 m². The guide’s construction notes include a fire separation, sound separation (STC 43), interconnected smoke and CO alarms and separate ventilation. Legalizing an existing suite costs $250 and removing one $200, and a suite permit expires 6 months after issue.

Plex homes, garden suites and carriage homes (SSMUH)

Zoning Bylaw 3300 implements the province’s small-scale multi-unit housing rules (housing page). In R1 (lots of 557 m² or more, 16 m frontage), up to 4 units are allowed, or 6 within 400 m of a frequent-transit bus stop, as a house with a suite, garden suite or carriage home, or a plex home (duplex, triplex or fourplex). Inside a Transit-Oriented Area only one house plus one suite, garden suite or carriage home is allowed, and plex homes are not permitted there; the bylaw maps TOAs around the Willowbrook and Langley City Centre SkyTrain stations and the Langley Centre bus exchange. R1 limits: lot coverage 36%; height 9.0 m for the main building (9.8 m for a three-storey building with a sloped roof), 6.8 m for a carriage home and 4.6 m for a garden suite; garden suites and carriage homes up to 100 m² on the ground floor, with the owner living on the lot. Carriage homes need 4.5 m rear and interior side setbacks (3.0 m with clerestory windows only).

Development permits may be required under the Official Community Plan. Under the Development Application Procedures Bylaw No. 3335 (adopted April 13, 2026), development permits for residential projects of 6 units or fewer are delegated to the Director of Development Services unless hazard or environmentally sensitive area guidelines apply (Bylaw 3335). Remember the sprinkler rule for buildings with three or more units.

Checked October 9, 2026: Zoning Bylaw No. 3300 (PDF) · deck guide · accessory building guide · suite guide · housing · Bylaw 3335 (PDF)

Inspections and trade permits

Request inspections on the 24-hour line at 604-514-2804 by 3 pm the day before, giving the address, permit number, inspection type, a contact name and phone number, and a morning or afternoon preference. Required documents go to the Building Division counter 24 hours before the inspection, and no work may be covered until it is approved (Guide for Residential Building Inspections, April 14, 2022).

Trade permits. The City issues plumbing and fire sprinkler permits. Electrical and gas permits come from Technical Safety BC: the City of Langley is not on Technical Safety BC’s list of 10 local governments that issue their own electrical or gas permits, and the City’s permit guides list Technical Safety BC (1-866-566-7233) for gas and electrical.

Common mistakes

Who to contact

PurposeContact
Building permits, inspections and inquiries604-514-2804 · inspections@langleycity.ca
Planning (zoning, suites, SSMUH, development permits)604-514-2831 · planning@langleycity.ca
Engineering (service disconnections, utility upgrades, trees)604-514-2997 · engineering@langleycity.ca
Bylaw enforcement604-514-2800 · bylaw@langleycity.ca
Fire department (fire safety, sprinklers)604-514-2880
Electrical and gas permitsTechnical Safety BC: 1-866-566-7233
City Hall20399 Douglas Crescent, Langley, BC V3A 4B3 · 604-514-2800 · Monday to Friday, 8:30 am to 4:30 pm

Checked October 9, 2026: contact us · permits and licensing · permit guide contact sheet · tree bylaw

Planning a deck, shed or fence as well? The deck, shed and fence checklists and the deck, shed and fence materials calculator help you price and prepare the job. Use the Permit Finder to confirm the right office for an address. Next door: our Township of Langley guide. Comparing nearby cities? See Surrey, Abbotsford, Burnaby and Richmond.

Frequently asked questions

Is this the City of Langley or the Township of Langley?

This page is for the City of Langley only. The Township of Langley is a separate municipality with its own bylaws, fees and building department, covering Willoughby, Walnut Grove, Aldergrove, Murrayville, Fort Langley and Brookswood. Both use "Langley, BC" in mailing addresses, so check the address in the City's Property Information search or interactive map, or in the Township's GeoSource map. Township addresses: see our Township of Langley guide.

How much is a building permit in the City of Langley in 2026?

Schedule 4 of Fees and Charges Bylaw No. 2837 (consolidated December 15, 2025) charges $200 for construction value up to $10,000, then $200 plus $10.56 per $1,000 or part over $10,000 up to $50,000, $576 plus $10.23 to $100,000, $1,088 plus $9.63 to $500,000 and $5,286 plus $10.00 above. By our arithmetic a $15,000 deck is $252.80 and a $900,000 house is $9,286. A $200 application fee for house work is paid when you apply and credited against the permit fee. Confirm with the City.

Is the $200 application fee extra?

No. Building and Plumbing Regulation Bylaw No. 2498, s.11.6, says the application fee is credited against the building permit fee when the permit is issued. You pay it up front, it is non-refundable, and the balance of the permit fee is paid at issuance.

How long does a City of Langley building permit take?

Not published. The City's building permit pages give no processing times or targets. It publishes monthly building permit reports, but they list permits issued, not review times. Ask the Building Division (604-514-2804).

How do I apply for a building permit in the City of Langley?

Download the guide and application package for your project from the City's Building Permits page, assemble the complete package (application form, Form 1 owner's acknowledgement, a title search no older than 48 hours, two sets of plans at 11 by 17 inches or larger) and submit it to the Building Division at City Hall, 20399 Douglas Crescent, paying the application fee at the time of application. The City says incomplete applications will not be accepted. We found no online building permit submission on langleycity.ca; permit fees can be paid online.

Do I need a permit for a deck or shed in the City of Langley?

A deck more than 2 feet (0.6 m) above finished grade, repairs or additions to an existing deck and a cover over a deck all need a permit, according to the City's deck guide. For sheds, the City's accessory building guide says a detached accessory building under 10 m² does not need a permit but must still meet zoning setbacks; 10 m² or more needs one.

Who issues electrical and gas permits in the City of Langley?

Technical Safety BC. The City of Langley is not one of the 10 local governments on Technical Safety BC's list that issue their own electrical or gas permits, and the City's permit guides list Technical Safety BC (1-866-566-7233) for gas and electrical. The City issues plumbing and fire sprinkler permits.

Check with the City before you build. This is independent information, not the City of Langley. It is a planning aid, not legal, engineering or building-code advice. Bylaws, fees and processes change, and the building official for your address has the final say. Confirm every requirement with the City of Langley Building Division before you design, apply or dig.