White Rock prices permits on a construction-value ladder, takes building permit applications at a booked intake appointment, requires sprinklers in every new building and adds geotechnical and floodplain checks on its slopes and waterfront. Here is the process, what it costs, what to submit and who to call.
Who this is for. Homeowners and small builders working inside the City of White Rock, from the waterfront along Marine Drive up the hillside to North Bluff Road. White Rock is surrounded by the City of Surrey, and many South Surrey addresses look similar: if the job is in Surrey, use our Surrey guide, and if the address is near the boundary, confirm it with the Permit Finder. Not sure the job needs a permit? Start with the permit quiz.
Is my project allowed? Zoning decides setbacks, height, lot coverage and whether a suite is allowed on your lot. Check it before you draw or apply for the permit: look up your address on the map, then read your zone in the bylaw.
Checked October 26, 2026 (City of White Rock): zone map · Zoning Bylaw 2024, No. 2506 (PDF)
| Item | What White Rock publishes |
|---|---|
| Permit fee | $234 up to $1,000 of construction value, then $20 per $1,000 or part to $100,000, $16 per $1,000 to $250,000 and $13 per $1,000 above (Bylaw 2554, Schedule A) |
| Paid when you apply | Non-refundable permit application fee: $227 for an addition or alteration to an existing home, $840 for a new house or houseplex |
| Processing time | Not published |
| How to apply | Book an intake appointment with a Building Official (604-541-2149) and bring the complete package. Plumbing, sprinkler, radiant heating and irrigation permits: the online City of White Rock Application Portal |
| Sprinklers | Required in all new buildings, city-wide (Bylaw 1683) |
| Trade permits | Plumbing, fire sprinkler, radiant heating and lawn irrigation permits from the City; electrical and gas from Technical Safety BC |
| Inspections | Call the 24-hour Inspection Line (604-541-2135) before 3:30 pm for the next business day |
Building Bylaw No. 1928 says no one may start or continue construction, alteration, demolition, relocation or a change of occupancy without a valid permit from a Building Official (s.6.2). Section 8.1 lists the permits: a building permit before constructing, repairing, altering or changing the use of a building or structure, plus moving, demolition, oil tank removal, fireplace and chimney, plumbing (including sprinkler systems) and pool permits. Each building or structure on a site needs its own permit and fee (s.8.4).
The City’s Guide for Building Permit Applications (February 2025) lists work that needs a permit, including a new home, a new accessory building or accessory structure, repairs, renovations and additions, removing or building interior walls, finishing an unfinished area, constructing, covering or enclosing a porch or sundeck, a swimming pool, hot tub or spa pool, chimneys and wood stoves, and new plumbing fixtures. The building permits page says a permit is not needed for:
Other common questions, from the City’s bylaws:
Checked October 9, 2026: City of White Rock building permits · Building Bylaw No. 1928 (PDF) · Guide for Building Permit Applications (PDF) · Zoning Bylaw No. 2506 (PDF)
If you are not sure, call the Building Division at 604-541-2149 or email building@whiterockcity.ca.
White Rock sets building fees in Schedule A of its yearly Fees and Charges Bylaw. The current one is the 2026 Fees and Charges Bylaw, 2025, No. 2554, adopted December 1, 2025 and in effect January 1, 2026 (consolidated May 12, 2026). The permit fee is based on construction value, which the Building Official may set using the Marshall Valuation Service or the Marshall & Swift Residential Cost Handbook:
| Construction value | Permit fee (Schedule A) |
|---|---|
| $0 to $1,000 | $234 |
| $1,001 to $100,000 | $234 + $20.00 for each additional $1,000 or part |
| $100,001 to $250,000 | $2,214 + $16.00 for each additional $1,000 or part |
| Over $250,000 | $4,614 + $13.00 for each additional $1,000 or part |
On top of the permit fee, a non-refundable permit application fee is paid when the application is accepted:
| Permit application fee (Schedule A) | 2026 |
|---|---|
| Addition or alteration to an existing home (including interior alterations to a multi-family unit) | $227 |
| Addition or alteration to an existing multi-family or commercial building (tenant improvements) | $480 |
| New single family dwelling or SSMUH (houseplex) | $840 |
| Other new buildings | 50% of the estimated permit fee, minimum $840, maximum $10,811 |
| All other permits | $95 |
Schedule A lists the application fee separately and does not say it is credited against the permit fee. The City’s 2026 monthly permit statistics back that up: by our check, 10 of the 17 house alteration and accessory building permits listed with a value and fee through mid-September show a fee equal to the ladder fee plus the $227 application fee exactly.
Worked examples (our arithmetic from Schedule A; estimates only, confirm with the City). A $15,000 deck: $234 + (14 × $20) = $514, plus the $227 application fee = $741. A $60,000 suite renovation: $234 + (59 × $20) = $1,414, plus $227 = $1,641, plus the $370 suite registration fee. A $250,000 addition: $2,214 + (150 × $16) = $4,614, plus $227 = $4,841. A $900,000 new house: $4,614 + (650 × $13) = $13,064, plus the $840 application fee = $13,904; for new houses the City may set its own construction value, so your figure can differ. Plumbing and sprinkler permits, tree permits, engineering and lot servicing fees, bonds and development cost charges are extra.
Other 2026 lines from Schedule A:
| Item | Fee |
|---|---|
| Re-review of plans (incomplete plans, or changes after issuance) | $306 per hour; first hour paid when revisions are submitted |
| Re-inspection, non-compliance or special inspection | $306 |
| Extension of permit / permit transfer | $243 / $427 |
| Secondary suite registration: with a new house / all others | $280 / $370 |
| Demolition permit: accessory building / house or duplex / commercial or multi-family | $100 / $1,276 / $1,524 |
| Plumbing: each fixture after the first (the first is in the application fee) | $49 |
| Sanitary sewer, storm sewer or water service (SFD/SSMUH zones), each | $95 |
| Building Code alternative solution: first / each later one | $742 / $248 |
| Tree Management Permit: Type 2 / Type 3 (building or demolition) | $558 / $1,163 |
Schedule A reduces the permit fee by 2.5% (up to $500) where any part of the work is under the review and letters of assurance of a Coordinating Registered Professional. Under Building Bylaw s.28.7, anyone who starts work before getting a required permit pays an extra charge equal to double the permit fee, which the City may waive for a first-time offender.
The City does not publish an online fee calculator. For a planning figure, our BC permit fee estimator applies the same Schedule A ladder and application fees.
Checked October 9, 2026: 2026 Fees and Charges Bylaw No. 2554, Schedule A (PDF, consolidated May 12, 2026) · Building Bylaw No. 1928 s.12 and s.28.7 · monthly permit statistics
Not published. None of White Rock’s building permit pages gives a processing time or target. The City posts monthly statistics of permits issued, but they list issue dates, values and fees, not how long review took. Building Bylaw s.8.5 says an application expires if you do not respond to information requests or plan review comments within 6 months of being notified, so answer promptly. Compare cities that do publish times on our BC building permit wait times page.
Checked October 9, 2026: new house and houseplex permits · renovation permits · application guide · Building Bylaw s.12 and s.13
More on packaging files: how to submit building permit drawings in BC.
The siting numbers below are from the RS-1 SSMUH Residential Zone (Zoning Bylaw 2506, section 6.1). RS-2, RS-3 (Small Lot, Hillside), RI-1, RI-2, RE-1 and RE-2 have their own numbers, so check your lot’s zone first.
The City’s application guide lists constructing, covering or enclosing a porch or sundeck as work that needs a building permit, and the City publishes no size or height below which a deck is exempt. Permit drawings show deck details, guards and stairs. In SSMUH zones, covered patios and decks up to 37 m² are left out of the floor area calculation (s.4.10.2). Deck membranes must be installed before the exterior framing and sheathing inspection.
A new accessory building or accessory structure needs a building permit under the City’s guide, whatever its size. In RS-1, only one ancillary building is allowed per lot. It may be no taller than 5.0 m, cannot sit in the required front or exterior side yard, must be at least 3.0 m from the house, and needs 1.5 m from the rear and interior side lot lines (2.4 m from an interior side line on a lane) (s.6.1.8 to s.6.1.10). Accessory buildings in RS zones do not need sprinklers unless they contain a dwelling unit.
A detached garage is an ancillary building, so the RS-1 limits above apply. In SSMUH zones, garages and carports up to 46.5 m² are left out of the floor area calculation (s.4.10.2). An accessory dwelling unit may be built over a garage in an ancillary building, but not on the same storey, apart from an entrance vestibule (s.5.6.1(c)).
A suite needs a building permit (applied for as an interior renovation) and must be registered with the City (secondary suites page). Under Zoning Bylaw s.5.5, an accessory registered secondary suite is allowed in all SSMUH zones and must be accessory to a one-unit, semi-detached or rowhouse building; one per lot; no more than 90 m² of residential floor area and two bedrooms; one extra on-site parking space; inspected and registered; and rented only for 90 days or longer. The City’s suite bulletin (BUILDING-12) adds that the suite must be inside the house (not in a detached building), cannot be stratified, and the owner must live in the main home. It also covers egress windows, separate heating controls, fire separations and STC 43 / ASTC 40 sound separation. Registration costs $280 with a new house or $370 otherwise, and an annual sanitary sewer levy applies. Existing unpermitted suites need building, plumbing and sprinkler permits to be legalized, or must be decommissioned (604-541-2146).
Zoning Bylaw No. 2506, adopted June 27, 2024, replaced White Rock’s single family and duplex zones with SSMUH zones (SSMUH page). In the RS-1 SSMUH zone, lots over 280 m² allow up to four units, or up to six on lots of at least 281 m² within 400 m of a prescribed bus stop; smaller lots allow up to three. RS-1 limits floor area to 0.75 times the lot area, lot coverage to 40% and height to 7.7 m for the main building; a detached accessory dwelling unit can be 7.0 m tall with a roof slope of at least 6:12, or 6.0 m otherwise. A houseplex is one building with two or more units, each with its own exterior entrance and at least 96 m² of floor area. The City’s SSMUH FAQ says White Rock has no Transit-Oriented Areas, that covenants on title still apply, and that the new zoning does not legalize suites built without a permit.
On development permits, the Official Community Plan (consolidated October 21, 2024) exempts single family houses and houseplexes of up to four units from form and character development permits (s.22.2). Lots in the Floodplain, Watercourse or Ravine Lands and Significant Trees areas still need an environmental development permit, and the City says it is reviewing its infill guidelines. Every new building also needs sprinklers, and a new house or houseplex pays the $840 application fee.
Checked October 9, 2026: Zoning Bylaw No. 2506 (consolidated June 2026) · application guide · suites · suite bulletin · SSMUH · OCP Bylaw 2220 (PDF)
Much of White Rock sits on a steep south-facing slope above Semiahmoo Bay, and several official rules follow from that:
Checked October 9, 2026: Building Bylaw No. 1928 s.11.3, s.25 and Schedule 3 · OCP Bylaw 2220, s.23 (PDF) · Zoning Bylaw No. 2506, s.4.4, 4.8, 4.9 and 6.3 · inspection bulletin
Call the 24-hour Inspection Line at 604-541-2135 with the site address, permit number, a site contact and the type of inspection (inspections page). Requests before 3:30 pm are booked for the next business day; the City’s on-site inspection bulletin (BUILDING-15) says later requests go to the second business day. Specific times are not available, but you can ask for a morning or afternoon window. The inspections page says inspections run between 9:30 am and 3:30 pm each business day; the bulletin says inspectors are on site from 9:00 am to 4:00 pm.
Trade permits. The City issues plumbing, fire sprinkler, radiant (hydronic) heating and lawn irrigation permits, applied for online through the City of White Rock Application Portal (plumbing and sprinkler permits). The work must be done by a licensed, qualified BC tradesperson with a City of White Rock business licence; intermunicipal business licences are not accepted. Electrical and gas permits come from Technical Safety BC: White Rock is not on Technical Safety BC’s list of 10 local governments that issue their own electrical or gas permits, and the City’s inspections page (which uses TSBC’s former name, the BC Safety Authority) and permit guide send electrical and gas permits and inspections there. The framing inspection needs an electrical and gas rough-in declaration.
| Purpose | Contact |
|---|---|
| Building permits, intake appointments and inquiries | 604-541-2149 · building@whiterockcity.ca |
| Inspections (24-hour booking line) | 604-541-2135 |
| Planning (zoning, SSMUH) | planning@whiterockcity.ca |
| Tree Preservation Official | 604-541-2143 · treebylaw@whiterockcity.ca |
| Engineering and Operations (lot servicing, roads and rights of way, service cap-offs) | 604-541-2181 · engpermits@whiterockcity.ca |
| Bylaw Enforcement (suite decommissioning) | 604-541-2146 · bylaw@whiterockcity.ca |
| Business licences | 604-541-2139 · licences@whiterockcity.ca |
| Electrical and gas permits | Technical Safety BC: 1-866-566-7233 |
| City Hall | 15322 Buena Vista Avenue, White Rock, BC V4B 1Y6 · 604-541-2100 · Monday to Friday, 8:30 am to 4:30 pm |
Checked October 9, 2026: building · inspections · tree permits · SSMUH · application guide · secondary suites
Construction hours under the Noise Control Bylaw are 7:30 am to 7 pm on weekdays and 9 am to 7 pm on Saturdays. On Sundays and statutory holidays only owners or occupants working on their own home may build, 9 am to 6 pm, and hired trades may not work at all (building page).
Planning a deck, shed or fence as well? The deck, shed and fence checklists and the deck, shed and fence materials calculator help you price and prepare the job. Use the Permit Finder to confirm the right office for an address. Comparing nearby cities? See Surrey, Richmond, Burnaby, Abbotsford and Vancouver.
Schedule A of the 2026 Fees and Charges Bylaw, 2025, No. 2554 (in effect January 1, 2026) charges $234 for construction value up to $1,000, plus $20 for each additional $1,000 or part up to $100,000, $16 per $1,000 from $100,000 to $250,000 and $13 per $1,000 above $250,000. A non-refundable permit application fee is extra: $227 for an addition or alteration to an existing home and $840 for a new house or houseplex. By our arithmetic a $15,000 deck is $514 plus $227, and a $900,000 new house is $13,064 plus $840. Confirm with the City.
Not published. The City's building permit pages give no processing times or targets. It publishes monthly statistics of permits issued, but they show issue dates and fees, not how long review took. Ask the Building Division (604-541-2149) for a current estimate.
Prepare the complete package from the City's checklist for your project, then call 604-541-2149 to book an intake appointment with a Building Official. Staff check the package at the appointment; an incomplete application is not accepted and you must book again. The application fee is paid when the application is accepted. Plumbing, fire sprinkler, radiant heating and lawn irrigation permits are applied for online through the City of White Rock Application Portal.
Yes, in most cases. The City's Guide for Building Permit Applications lists constructing a new accessory building or accessory structure and constructing, covering or enclosing a porch or sundeck as work that needs a building permit, and it publishes no size or height below which a deck or shed is exempt. Ask the Building Division before you build.
Technical Safety BC. White Rock is not one of the 10 local governments that issue their own electrical or gas permits, and the City's inspections page and permit guides send electrical and gas permits and inspections to Technical Safety BC (1-866-566-7233). The City issues plumbing, fire sprinkler, radiant heating and lawn irrigation permits.
Yes. Fire Sprinkler System Bylaw No. 1683 makes the whole city a fire limit area and requires an approved sprinkler system in all new buildings, and in the whole building when an addition or renovation increases the gross floor area by more than 25%. Accessory buildings in single family (RS) zones, and accessory buildings under 10 m² in any zone, are exempt unless they contain a dwelling unit.
On most residential lots, yes. Zoning Bylaw No. 2506, adopted June 27, 2024, put former single family and duplex lots into SSMUH zones. In the RS-1 SSMUH zone, lots over 280 m² allow up to four units, or up to six within 400 m of a prescribed bus stop. You still need a building permit, and a development permit if the lot is in a floodplain, watercourse or ravine development permit area.
Check with the City before you build. This is independent information, not the City of White Rock. It is a planning aid, not legal, engineering or building-code advice. Bylaws, fees and processes change, and the building official for your address has the final say. Confirm every requirement with the White Rock Building Division before you design, apply or dig.