Decks 0.6 m or higher need a City of Victoria building permit, and every deck counts toward site coverage. Here’s the City’s process, the drawings, the code rules and each inspection.
This guide covers building a deck in the City of Victoria from start to finish, following Victoria’s own process: the zoning rules the City singles out for decks, the online SFD/Duplex eApplication, the drawings on the City’s checklist, the BC Building Code 2024 rules for footings, framing, ledgers, guards and stairs, and Victoria’s inspection booking system. The permit trigger is set by the Building and Plumbing Regulation Bylaw No. 17-113. It doesn’t apply to platforms less than 0.6 m above grade (s.5(2)(b)), so a deck at 0.6 m or higher needs a building permit (Bylaw 17-113, consolidated PDF). The City’s Adding a Deck sheet puts it simply: before you can begin construction, you need a building permit (City of Victoria, Adding a Deck (PDF)).
A low deck still has to meet zoning. The 0.6 m exemption is from the building bylaw only. The zoning points below (setbacks, site coverage, accessory buildings) apply at any height.
“Victoria” on a mailing address doesn’t mean the City of Victoria issues your permit. Greater Victoria is split into separate municipalities, each with its own building bylaw and deck rules; Saanich, Oak Bay and Esquimalt all border the City. To confirm:
Is my project allowed? Zoning decides setbacks, height, lot coverage and whether a suite is allowed on your lot. Check it before you draw or apply for the permit: look up your address on the map, then read your zone in the bylaw.
Checked October 26, 2026 (City of Victoria): VicMap · Zoning Regulation Bylaw
Victoria publishes a one-page Adding a Deck sheet on the zoning side of a deck. Its main points (source):
Development permits come first. The City’s eApplication checklist says applicable development permits must be issued before a building permit application is accepted (SFD/Duplex eApplication checklist, PDF). Heritage-designated properties and heritage conservation areas carry their own approvals (City of Victoria, heritage). See our Victoria development permit guide for whether a DP applies to your lot.
Trees. The checklist asks you to show every tree on and next to the property, labelled as retained or removed, with canopy spread, protected root zone and tree-protection fencing. For “development related” applications (as defined in the Tree Protection Bylaw) you also need an arborist report and a tree management plan, and a tree permit may be required. A deck footing inside a protected root zone is a common reason for redesign, so verify with the city early whether your project counts as development related.
Victoria fee waiver (verified on 2026-10-05). The City of Victoria’s Development Fee Waiver Bylaw No. 26-020, s.4, sets the building permit fees in Schedule A of Building and Plumbing Regulation Bylaw 17-113 (items a–f: the application fee, the permit fee, the higher fee for work started without a permit, and extension, plan-revision and re-inspection fees) to $0, along with plumbing permit fees (items h–m), City electrical permit fees (Schedule E of the Electrical Safety Regulation Bylaw) and land-use application fees (Schedule A of the Land Use Procedures Bylaw). Under s.3 it applies to complete applications received after its adoption on January 29, 2026, up to and on the day it is repealed; s.5 repeals it 12 months after adoption (the City gives January 29, 2027). It is not limited to housing. The excavation deposit (Schedule A item g) is not waived, and charges under bylaws the waiver does not list, such as development cost charges, are not covered by it. If your permit will be issued after the repeal date, confirm with the City whether the fee is still $0. The deck figures above are the normal Schedule A fees, which apply outside the waiver. Bylaw 26-020 (PDF)
Codes of Practice form: not needed for applications that only involve deck or balcony repairs or upgrades (checklist). Hazardous materials: the checklist lists a hazmat survey for buildings built fully or partly before 1990, because they may release asbestos. If your ledger work will cut into an older house’s wall, ask whether it applies. Electrical: unlike most BC municipalities, Victoria issues its own electrical permits, so deck lighting or a new outdoor receptacle is permitted through the City (City of Victoria electrical permits).
Victoria’s SFD/Duplex checklist (dated September 4, 2026) covers “New Projects, Additions and Exterior Alterations”, and a deck falls under it. Building plans at a preferred scale of 1/4 in. = 1 ft (minimum 3/16 in.) and a metric site plan. For a deck, the relevant items are (source):
Survey. For standard buildings, Bylaw 17-113 s.11(1)(b) calls for a site plan prepared by a BC land surveyor, and s.11(3) lets the building official waive that in whole or part for repair or alteration of an existing building. Whether a surveyed plan is needed for your deck addition is a verify-with-the-city question. Ask before you pay for one.
Planning sketch. The deck plan sketch maker draws a watermarked, to-scale sketch of your own layout to take to the City or a designer. Don’t submit it: the checklist above accepts only plans prepared to professional drafting standards and turns away plans marked “not for permit” or similar.
City example plans. Victoria posts a set of deck diagrams from March 2013 (deck diagrams, PDF). They predate the BC Building Code 2024, so use them for layout ideas, not as current requirements.
Victoria BC Deck Permit: Drawings, Fees & Inspections, Step by Step (2026)
Building a deck in the City of Victoria, BC? Victoria’s Building and Plumbing Regulation Bylaw requires a building permit before you construct, repair or alter a structure, and exempts platforms less than 0.6 m above grade. This walkthrough covers checking your zone on VicMap, when a deck needs a permit, how height changes the design (BC Building Code 2024), setbacks, site coverage and trees, the drawings the City’s checklist asks for, applying online, the bylaw fees and the temporary fee waiver, the inspections, and the mistakes that most often cause trouble.
Download the video (MP4) · Watch on YouTube (BC Trades & Permits)
Narration uses a synthetic (AI-generated) voice.
Victoria enforces the BC Building Code. A permit applied for on or after March 8, 2024 falls under the BC Building Code 2024, and a house deck is designed under Part 9 unless it needs engineering (Province of BC, BC Building Code 2024). The article numbers below were checked against the official BCBC 2024 PDF. They are summaries, so read the code text and follow your approved plans.
How to Build a Deck in Victoria, BC: Footings to Final Inspection (2026)
Part 2 of our Victoria deck series. Once your City of Victoria building permit is issued, this diagram walkthrough follows a typical attached deck from layout to final inspection: squaring with the 3-4-5 method, footings and post bases, posts and beams, ledger attachment or freestanding, joists and hangers, decking, stairs, guards, and Victoria’s foundation, framing and final inspections. Each figure is cited to the BC Building Code 2024 Part 9, BC Housing’s deck guide or City of Victoria documents. Where sizes depend on span tables, check the span tables in BC Building Code Part 9, or with your lumber supplier and building inspector.
Download the video (MP4) · Watch on YouTube (BC Trades & Permits)
Narration uses a synthetic (AI-generated) voice.
A deck serving a single dwelling is designed for the specified roof snow load or 1.9 kPa, whichever is greater (9.4.2.3.), and deck members must meet the L/240 deflection limit in Table 9.4.3.1. The City publishes the local climatic and seismic values its reviewers use; its current sheet lists a ground snow load (Ss) of 1.5 kPa and a rain load (Sr) of 0.3 kPa (City of Victoria climatic and seismic data, PDF). A hot tub, planters or a roof over the deck take you outside the simple Part 9 tables, so plan on an engineer.
BCBC 2024 has no deck-ledger fastening schedule. BC Housing’s deck guide notes that the code offers little guidance on ledger fastening and calls the ledger a common failure point (BC Housing deck guide, PDF). If you attach, its best practice is 13 mm lag screws or through-bolts, staggered, fully through the ledger and the house rim joist, spaced by joist span (for example 381 mm for lag screws at a 3.66 m span), with a pressure-treated ledger of at least 38 × 184 mm, flashing and a drainage gap. If you can’t confirm what the house rim joist is, or the wall is masonry, a freestanding deck, with its own beam and posts along the house, is often simpler to get approved. The example below is freestanding for that reason. Note, though, that a deck that is structurally freestanding is still close to the house, so the 9.12.2.2.(7) relaxation isn’t automatic. Verify with the city.
Victoria’s permit package lists the inspections for a building permit and requires at least 24 hours’ notice. You need the building official’s acceptance of each stage before it is concealed (source; Required Inspections, PDF). The list is written for houses, so here is how it maps onto a deck:
| City stage | What it means for a deck |
|---|---|
| Foundation inspection | The City lists this for drain tile and dampproofing before backfill. Victoria’s list has no separate deck-footing stage, so ask your inspector whether they want to see footing holes or forms before you pour. Don’t assume they don’t. |
| BC land surveyor certificate | Only where a special condition on your permit requires one, submitted as the condition instructs. |
| Framing | “Prior to concealing the framing and sheathing.” For a deck: posts, beams, bracing, joists, hangers, ledger fasteners and flashing, all visible before decking or skirting goes on. |
| Final | When the deck is substantially complete: guards, stairs, handrails, glass (with any engineer’s letters) and grading. |
| Electrical (if any) | Separate City electrical permit and inspection. |
How to book (City of Victoria, request an inspection):
Printable: take the deck inspection checklist (before you book, footings, framing, final) to the site before each inspection.
Budget the materials: the deck, shed and fence materials cost calculator counts joists, deck boards, posts, concrete bags, hangers, post bases and screws for your size of deck, then prices them with dated BC retailer prices.
General guidance for one Victoria example: a freestanding 3.66 × 3.05 m (12 × 10 ft) deck, 3.66 m along the house, walking surface about 1.2 m above grade, two beams with joists at 400 mm (16 in.) on centre spanning between them, and one stair. Quantities are rounded, with no prices. The span tables and your approved drawings set the real sizes.
| Item | Approx. quantity | Notes |
|---|---|---|
| Beams (built-up, pressure-treated) | 2 at 3.66 m | One along the house, one at the outer edge. Number of plies per design. |
| Posts, pressure-treated | 4–6 | At least 140 × 140 mm unless calculated. Spacing per the beam span table. |
| Footings and post bases | 4–6 | One per post, sized per the footing plan. Uplift-resistant post anchors. |
| Post bracing | 1 knee or diagonal brace per post, per direction as designed | Needed because the joists are more than 600 mm above ground (9.17.2.2.). |
| Joists, pressure-treated | 10 at about 3.05 m | 3.66 m ÷ 406 mm = 9 spaces, so 10 joists. |
| Rim joists | 2 at 3.66 m | Both long sides. |
| Joist hangers or hurricane ties | about 20 | Depends on whether joists sit on or between the beams. |
| Decking, 140 mm boards | about 21 rows of 3.66 m | 3.05 m ÷ about 146 mm per board with gap. |
| Deck screws (corrosion-resistant) | about 450 | 21 rows × 10 joists × 2, plus spare. |
| Guard | about 8.9 m run | Two 3.05 m ends plus the 3.66 m outer edge, less a 0.9 m stair opening. 900 mm high at this height. |
| Balusters (38 mm) | about 60–70 | At roughly 138 mm on centre so gaps stay under 100 mm. |
| Stair stringers | 3 | For a 1.2 m rise: 7 risers of about 171 mm and 6 treads of 255 mm or more. |
| Stair guards and handrail | both sides of the stair (guards), 1 handrail minimum | The stair drop exceeds 600 mm and it has more than 3 risers. |
| Landing pad at stair base | 1 | Keeps the bottom stringer ends off the soil. |
Related: Victoria building permit guide · Victoria development permits · Printable deck inspection checklist · Deck permit how-to for BC · Deck and shed rules by city · 30-second permit quiz
Most houses, suites, decks and garages fall under Part 9 of the BC Building Code 2024: buildings of 3 storeys or less, up to 600 m², with residential or certain other uses (Division A, 1.3.3.3). Bigger buildings fall under Part 3, which always needs registered professionals and Letters of Assurance (Division C, 2.2.7.1).
On a Part 9 project, the Code requires a registered professional (an engineer or architect who seals drawings and signs Letters of Assurance) only for parts outside Part 9. Examples are beams with point loads, girder trusses, engineered products, soil or foundation conditions beyond Part 9, and retaining walls that support a foundation. The province also recommends professional design for other retaining walls over 1.2 m. For the rest, the Code doesn’t say who must draw the plans. The city sets the drawing standard.
Victoria accepts only plans “prepared to professional drafting standards” and rejects plans marked “not for permit”.
Checked October 26, 2026: BC Building Code 2024 (PDF) · Guide to Letters of Assurance (PDF) · Letters of Assurance (gov.bc.ca) · EGBC guidelines · AIBC: does your project need an architect? · eApplication checklist (PDF)
Yes, in most cases. Bylaw 17-113 s.5(2) exempts some work, including platforms less than 0.6 m above grade. Confirm with the City before relying on it. Building and Plumbing Regulation Bylaw No. 17-113 s.5(2)(b) excludes those platforms. The City’s Adding a Deck sheet says you need a building permit before you begin construction. Zoning rules such as setbacks and site coverage apply at any height.
Yes. The City’s Adding a Deck sheet says the deck is included in site coverage calculations, as defined in Schedule A of the Zoning Regulation Bylaw. Its setbacks may also differ from those of the existing house.
Apply online through the City’s SFD/Duplex Building Permit eApplication, with each checklist item as a separate PDF. Applications are screened for completeness. You then get a link to pay the $100 application fee, and the target review time is seven business days. Any applicable development permit must be issued first.
Yes, for complete applications received in the waiver window. The City’s Development Fee Waiver Bylaw No. 26-020, s.4, sets the Bylaw 17-113 Schedule A building permit fees (items a–f) and plumbing permit fees (items h–m) to $0 for complete applications received after the bylaw’s adoption on January 29, 2026, up to and on its repeal date 12 months after adoption (s.3 and s.5; the City gives January 29, 2027). The excavation deposit (item g) is not waived. Verified on 2026-10-05. The eApplication checklist still describes a $100 application fee link, so confirm with Permits and Inspections (250-361-0344) what applies to your application.
The City’s list requires at least 24 hours’ notice and acceptance before work is concealed. For a deck, that usually means footings (ask the inspector whether they want to see holes or forms, since the City list has no separate deck-footing stage), framing before decking, and a final. Book through MyCity, by phone at 250-361-0344, by email or in person, by 4 p.m. the day before.
Victoria’s glass guard bulletin says glass guards without a top rail fall under Part 4 of the BC Building Code and need a professional engineer. Where the floor is no more than 1.8 m above grade, the inspector may accept an installation without an engineer’s review, case by case, if the glass is at least 1/2 in. laminated tempered and properly supported.
Under Bylaw 17-113 s.12(4), the permit expires if work isn’t substantially started within 12 months of issue or stops for 12 months. A building official can grant an extension for hardship beyond the owner’s control, on payment of the permit extension fee ($100, Schedule A item d).
Independent information only. This guide is a planning aid, not legal, engineering or building-code advice. Codes and bylaws change, and the building official for your address has the final say. Confirm every requirement before you design, apply or dig.
This guide relies on the official pages below. Rules, fees and processes change, so check the authority before you apply or spend money.
Links checked September 25, 2026. Found an error or a broken link? Report it.